Skip to main content

Quick Summary

Lightning protection testing is a legal duty for many UK building owners, guided by BS EN 62305. The Electricity at Work Regulations 1989 require electrical systems to be kept in a safe condition, and the standard describes how to meet that duty.

  • The Electricity at Work Regulations 1989 require electrical systems to be maintained in a safe condition.
  • BS EN 62305 sets out how lightning protection systems should be designed, installed and inspected.
  • Inspection interval depends on the building’s use, risk and system condition, and should be set by a competent person.
  • A typical inspection covers visual checks, continuity testing, earth termination resistance and bonding checks.
  • A compliant test report should record what was inspected, the results, any defects and recommended remedial work.

Table of Contents

What the Law and BS EN 62305 Require for Lightning Protection Testing

Last Updated: November 19, 2026

Lightning protection testing is a legal duty for many UK building owners, and the standard that guides it is BS EN 62305. Duty holders often mix up what the law requires with what the standard recommends. Keep those two apart and the rest of the process is much simpler.

The Electricity at Work Regulations 1989 require electrical systems to be maintained in a safe condition. Health and Safety Executive guidance on electrical safety at work. BS EN 62305 sets out how lightning protection systems should be designed, installed and inspected.

  • Legal duty: keep the building and its systems safe.
  • Standard: BS EN 62305 describes how to meet that duty.
  • Recommendation: testing intervals, checklists and report formats.

Lightning Protection Testing Frequency and Inspection Checklist

The right inspection interval depends on the building’s use, risk and system condition, and should be set by a competent person.

Technician inspecting a down conductor and earth test point during lightning protection testing on a building
Technician inspecting a down conductor and earth test point during lightning protection testing on a building

Testing should be carried out by a competent person (PAT (Portable appliance testing)). A typical inspection covers:

  • Visual check of air terminals, down conductors and joints
  • Continuity testing of the conductor network
  • Earth termination resistance checks
  • Bonding and conductive path checks

The article breaks a typical lightning protection inspection into four checks that a competent person should carry out.

Check What it covers Who carries it out
Visual check Air terminals, down conductors and joints Competent person
Continuity testing Conductor network Competent person
Earth termination resistance Earth termination resistance checks Competent person
Bonding and conductive paths Bonding and conductive path checks Competent person

Lightning Protection System Maintenance, Test Reports and Next Steps for Your Building

A compliant test report should record what was inspected, the results, any defects found and the recommended remedial work. Keep these records with your building maintenance file.

If a defect is found, act on it promptly. Arrange remedial work, retest the affected part, and update the report.

Frequently Asked Questions

How often should a lightning protection system be tested?

BS EN 62305 recommends periodic inspection and testing of a lightning protection system, and many duty holders follow a 12-month interval, with a shorter interval where the building use, risk or system condition justifies it. A full inspection should also follow any suspected lightning strike, significant alteration or repair. The correct interval should be set by a competent person after a risk assessment, and it should be recorded in the maintenance plan so that the duty holder can show it was reasoned and followed.

What should a lightning protection test report contain?

A compliant lightning protection test report should identify the building and system, the date and scope of the inspection, the inspector’s name and competence, the visual inspection findings, the continuity and earth resistance results, any defects with their priority, and the recommended remedial actions. It should also state the next inspection date. Keeping these records with the building’s maintenance file helps the duty holder demonstrate compliance to insurers, enforcing authorities and future contractors.

Is lightning protection testing a legal requirement in the UK?

There is no single UK statute that names lightning protection testing by interval, but the duty to keep systems safe falls under general health and safety law, including the Management of Health and Safety at Work Regulations 1999 and the Electricity at Work Regulations 1989. BS EN 62305 sets out the technical standard that competent inspectors use. Duty holders should treat its inspection and maintenance guidance as the benchmark for showing reasonable steps have been taken.

Close Menu
Free Quote
close slider

For a FREE no obligation quote, please fill in the secure contact form below.

This field is for validation purposes and should be left unchanged.
Name(Required)
Max. file size: 4 GB.